Arpeggio is a new master-planned community of contemporary stacked townhomes at Harvest Moon Drive & Emil Kolb Parkway, Bolton, within the Town of Caledon, Ontario. Freehold townhomes are priced from the $1,000,000s and detached homes from $1,000,000, with estimated closings in 2028. The community is being built by Camcos Living, a Canadian federally incorporated homebuilder (est. June 29, 2011) with 45+ active projects across Ontario, including Caledon's Orchard Park and Summer Valley. Register for VIP access to secure the best pricing and lots before public launch.
Arpeggio sits at the intersection of Harvest Moon Drive and Emil Kolb Parkway in Bolton — Caledon's largest urban centre — inside the growth area designated by the Bolton Residential Expansion Study (BRES) and the Bolton Secondary Plan (Caledon Official Plan Amendment 3, adopted November 25, 2025). Bolton's 2021 census population was 26,795, part of a Caledon municipality of 76,581 in 2021 that has grown to approximately 93,000 residents by 2026 and is planned to reach substantially higher populations by 2051 under Caledon's updated Official Plan (approved by the Province of Ontario on October 22, 2025).
Bolton is served by the Peel District School Board (English public) and the Dufferin-Peel Catholic District School Board. Nearby schools include:
Assigned school-of-record can shift with new development — confirm boundaries via peelschools.org and dpcdsb.org locator tools before closing.
Modern freehold townhomes designed for first-time buyers, young families and investors. Standard features are expected to include 9-foot main-floor ceilings, smart-home wiring, energy-efficient building envelope, and premium finishes consistent with Camcos Living's other current GTA/Ottawa communities (including its Ottawa "Summit Series" prefab townhomes). Freehold ownership means no condo fees.
Family-scale detached homes on generous lots. Multiple elevations and floorplan sizes are expected at launch, with layouts designed for growing families and multi-generational living. Full floorplans and elevations are released to VIP registrants first.
On March 25, 2026 the Government of Ontario (Premier Doug Ford) and the federal government (Prime Minister Mark Carney) jointly announced an enhanced New Housing Rebate, confirmed in the Ontario Budget tabled March 26, 2026. Key facts:
Arpeggio's 2028 closing timeline and $600K–$1M pricing fall squarely within the eligible bands and construction window — making this one of the most tax-advantaged buying windows for new construction in Ontario in over a decade.
Arpeggio is positioned inside three converging growth catalysts:
The Province of Ontario approved Caledon's updated Official Plan on October 22, 2025, guiding growth to 2051. On November 25, 2025, Caledon Council adopted Official Plan Amendment 3 (Bolton Secondary Plan) and OPA 7 (Growth Management & Phasing Plan). The Bolton Residential Expansion Study identified the Harvest Moon/Emil Kolb area as a priority expansion zone.
Highway 413 — a 59-km freeway from Highway 400 in Vaughan/York to Highway 401/407 ETR in Halton/Peel — was formally corridor-designated on November 27, 2025. The Final Environmental Impact Assessment Report was published in March 2026 and early-works construction is underway. When delivered, Highway 413 will materially improve commute times from Bolton to Vaughan, Brampton, Mississauga and York Region.
Ontario committed to prioritize the Bolton Line under "GO 2.0" on February 6, 2025. On April 21, 2026, Caledon Council directed staff to continue advocating for an in-service date before 2041. The GO station is a long-range project confirming Bolton's future role as a transit-connected community north of Vaughan.
You're not buying a home — you're buying into the future of Bolton.
Camcos Living Inc is a federally incorporated Canadian homebuilder and land developer (incorporated June 29, 2011) headquartered at 3713 Borrisokane Road, Nepean (Ottawa), Ontario. Camcos Living is a vertically integrated community developer with 45+ active projects across Ontario, primarily in the Ottawa region and the Greater Toronto Area. Camcos Living is known for:
Arpeggio is at Harvest Moon Drive & Emil Kolb Parkway in Bolton, Caledon, Ontario — approximately 43.8830° N, -79.7370° W — in the Regional Municipality of Peel, GTA.
Camcos Living — a federally incorporated Ontario homebuilder (est. 2011, HQ Nepean) with 45+ active projects across the province.
Freehold townhomes from approximately $1,000,000. Prices subject to change; final pricing released to VIP registrants first.
Estimated closings are in 2028.
Yes, likely — the 2028 closing timeline and pricing fall inside the eligible signing window (April 1, 2026 to March 31, 2027) and construction window (start by Dec 31, 2028, substantially complete by Dec 31, 2031) announced by Ontario and Canada. Combined savings up to $130,000. Confirm eligibility with the sales office and your lawyer.
Yes — the Caledon–Vaughan–Toronto GO Rail (Bolton Line) is a committed provincial project. Caledon Council on April 21, 2026 directed staff to push for in-service before 2041.
Yes — the corridor was designated November 27, 2025 and early works construction is underway. When delivered, Highway 413 will directly connect the Bolton area to Highway 400 and Highway 401/407 ETR.
Freehold — no condo fees. You own the home and the land.
Peel District School Board (public) and Dufferin-Peel Catholic District School Board — including James Bolton Public School, St. John the Baptist and St. John Paul II Catholic elementary schools. Confirm the assigned school of record at closing.
Visit thearpeggiobolton.ca/register or call 289-400-0110.